Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Reverted from v. 23


About this project

OP-TEE is an open source TEE that has been well received by SoC vendors and OEMs and has been deployed in mobile phones, tablets, cameras, set-top boxes etc. On this project page you will find what Linaro plans to work with when it comes to OP-TEE.

Linaro used to own the OP-TEE project, but in September 2019 the ownership was transferred to the TrustedFirmware.org project. Despite that Linaro still continues to contribute to the OP-TEE project just as before, the only difference is that Linaro should from now on be seen as any other contributor to the OP-TEE project. To try to avoid confusion with OP-TEE at TrustedFirmware.org, we've named our project "Linaro OP-TEE contributions".

This means that Linaro makes an internal roadmap for OP-TEE, a roadmap that is in sync with the members of Linaro as well as with the TrustedFirmware.org project.

Get Involved


Meetings


Info
iconfalse


Viewport Tabs Container


Viewport Tab
titleCalendar

Widget Connector
urlhttps://calendar.google.com/calendar/embed?src=linaro.org_havjv2figrh5egaiurb229pd8c%40group.calendar.google.com&ctz=Europe%2FLondon



Viewport Tab
titleMeetings Notes

Children Display
pageMeeting notes
first5

Google Dock Meeting Notes / Upcomming Agenda

Agenda discussions are on the list the week prior.






Info
iconfalse


Viewport Tabs Container


Viewport Tab
titleCurrent Plan

 

The following items are on the project backlog but not currently planned. If you are interested in contributing to any of these items, please state your intention on the project's mailing list (found above)

Jira
serverJira
columnskey,summary,type,assignee,status,resolution
maximumIssues12
jqlQueryproject = LOC AND status in ("In Progress", ToDo, Review, Blocked)
serverId9aaf0a9e-ca09-3b0e-8d89-418a53564c8a


Viewport Tab
titleProposed Plan

 The following items are on the project backlog and proposed for the next cycle

Jira
serverJira
columnskey,summary,type,

created,updated,due,

assignee,

reporter,priority,

status,resolution
maximumIssues

20

12
jqlQuery

project in (LOC, SWG, STR, TS) AND component = OP-TEE AND

"Planned for"

=

in ("1 - Next cycle") and project in ("Linaro's OP-TEE Contributions")
serverId9aaf0a9e-ca09-3b0e-8d89-418a53564c8a


Viewport Tab
titleBacklog

The following items are on the project backlog but not currently planned. If you are interested in contributing to any of these items, please state your intention on the project's mailing list (found above)

Jira
serverJira
columnskey,summary,type,assignee,status,resolution
maximumIssues12
jqlQueryproject in (LOC, SV, SWG, SCMI, LCG, STR, TS) = LOC AND status = Open AND component = OP-TEE ORDER BY summary ASC open
serverId9aaf0a9e-ca09-3b0e-8d89-418a53564c8a



Viewport Tab
titlePlan of Record

 

Drive
embedUrlhttps://docs.google.com/presentation/d/1qguODqUGCX7EBE3GXGAKo81VPEtL70GjBA8xlKAh8cM/preview
editUrlhttps://docs.google.com/presentation/d/1qguODqUGCX7EBE3GXGAKo81VPEtL70GjBA8xlKAh8cM/edit?usp=drive_web
fileNameLinaro's OP-TEE Contributions (LOC) - Proposed Plan - 5 Oct 2020 - 4 Apr 2021
width100%
iconUrlhttps://drive-thirdparty.googleusercontent.com/16/type/application/vnd.google-apps.presentation
mimeTypeapplication/vnd.google-apps.presentation
urlhttps://docs.google.com/presentation/d/1qguODqUGCX7EBE3GXGAKo81VPEtL70GjBA8xlKAh8cM/preview
fileId1qguODqUGCX7EBE3GXGAKo81VPEtL70GjBA8xlKAh8cM
height600


Viewport Tab
titleHealth Checks

 

Widget Connector
urlhttps://docs.google.com/presentation/d/e/2PACX-1vTyKZrVIgei7R8UcVIXMoYDHcn5C3oWWQkA1WvZy0cH4qmbtaQsYv7uVoODxzrE8CvKSwqs1t8XIMc4/pub?start=false&loop=false&delayms=3000








Linaro Ltd.