2019-07-16 HPC Meeting Agenda/Minutes

Attendance

Committee Members 

NamePresent
Elsie Wahlig (Sr Director LDCG, Linaro)(tick)
Andrew Wafaa (Arm)

(tick)

Pak Lui (Futurewei)

(tick)

Larry Wikelius (Marvell)

(tick)

Jon Masters (Red Hat)

(error)

Takeharu Kato (Fujitsu)

(tick)

Koichi Hirai (Fujitsu)(tick)
Kevin Pedretti (Sandia NL)(error)
Yutaka Ishikawa (Riken)(error)
Jakob Blomer (CERN)(error)


(error) Not present

(tick) Present



Guests 

NamePresent

Mark Orvek (VP Engineering, Linaro) 

(tick)

Andrea Gallo (VP Memberships, Linaro)

(tick)

Joshua Terry (HPC Tech Lead, Linaro)

(tick)

Baptiste Gerondeau (HPC Engineer, Linaro) (tick) 
Graeme Gregory (LDCG Engineering Mgr, Linaro)(tick)  

Victor Duan (Japan Country Mgr, Linaro)

(error) 

Jammy Zhou (China Country Mgr, Linaro)(error)
Eric Van Hensbergen (Arm)(error)
Brent Gorda (Arm)(tick)
Darren Cepulis (Arm)(tick)  
Masakazu Ueno (Fujitsu)(tick)
Xavier Valls (CERN)(error)
Joel Jones (Marvell)(error)
Bill Gray (Red Hat)(error) 
Andrew Younge(tick) 

Dial in Information

Elsie Wahlig is inviting you to a scheduled Zoom meeting.

Topic: Elsie Wahlig's Personal Meeting Room

Join Zoom Meeting
https://zoom.us/j/6112761834

One tap mobile
+16465588656,,6112761834# US (New York)
+17207072699,,6112761834# US

Dial by your location
+1 646 558 8656 US (New York)
+1 720 707 2699 US
+1 877 853 5247 US Toll-free
+1 888 788 0099 US Toll-free
Meeting ID: 611 276 1834
Find your local number: https://zoom.us/u/aeGoL7KgTk

Agenda 

  • Previous meeting notes:  2019-07-2 HPC Meeting Agenda/Minutes
  • Topics for 16 July 2019: 
    • Introduction to Joshua Terry
    • Lustre Testing Update, Baptiste
    • Valgrind, Andy Wafaa/ David Lecomber
    • Roadmap & Priorities
  • AOB

Minutes

  • Lustre Testing Update, Baptiste
    • Pak:  What is problem preventing Lustre server from running?   
    • Baptiste:  Kernel needs extra patches. 
  • Valgrind, Andy Wafaa/ David Lecomber
    • Arm will add engineer for Valgrind development (from David Lecomber's team)
    • Andrew Young:  timeline?

    • Andy Wafaa says 8 weeks for Milestone 1.  Start date is being finalized. David Lecomber has a person identified in his team.

    • Sy Hammond:  Does this include the Large System extensions (LSE)?   It stops immediately without LSE support. 

    • Sandia can throw testing at it.  

  • Roadmap & Priorities
  • AOB
  • Darren askas about SLES testing on Lustre
    • Larry:  There has been work on SLES15 in the Catalyst installation. 
    • Elsie to reach out to Catalyst and SUSE person working on Lustre. 
  • Next meeting
    • Review Healthcheck 

Action Items

  • Add Valgrind to Roadmap   Elsie
  • Elsie to reach out to Catalyst and SUSE person working on Lustre. Neil Brown is the SUSE engineer working on Lustre (based in Australia).  What is the ARm support for SLES on Arm for Lustre?


Recording Link